“This was a fairly standard project for us, although we do take pride in working on large high profile projects like these for large companies”, says Arvid Veidmark III, Executive Vice President of SSC. SSC’s work on this project took less than 2 weeks to complete in total. SSC was contracted to horizontally auger bore 140’ under a major roadway, with 4 duct banks, to install a 12” waterline inside of a 36’ casing. SSC’s expertise in Arizona soils made the company uniquely qualified for this project. Horizontal auger boring was the perfect trenchless construction method for this project, because it had no impact on the existing conduits running in the roadway. ![]() The contractor responsible for renovations at the new Apple data center, needed to install a new waterline to the facility, whose path crossed through the roadway and the underground conduits coming from the nearby Salt River Project’s (SRP) utility sub-station. Horizontal Auger Bore at new Apple data center site in Mesa, AZ
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |